Eaton Electrical Extended Battery Module (EBM) 9140 Uživatelský manuál Strana 24

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 44
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 23
INSTALLATION
EATON Powerware
®
9140 EBM User’s Guide S 164201623 Rev A FINAL DRAFT 2006 July 14
18
Rack Setup for the EBM
NOTE Mounting rails are required for each individual cabinet.
NOTE The recommended configuration is to install the EBM(s) in the lower part of the rack,
with the UPS directly above the EBM(s).
To install the EBM rail kit:
1. Select the proper holes in the rack for positioning the E BM in the
rack (see Figure 1).
NOTE The EBM takes up position 1 through position 9.
Position 2
Position 5
Position 8
Screw
Positions for
Rail and Front
Mounting
Bracket
Position 4
Position 3
Bottom of Rack
or Top of Other
Cabinet
Figure 1. Front Rail Screw Positions for the EBM
Zobrazit stránku 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 43 44

Komentáře k této Příručce

Žádné komentáře